{"id":4543,"date":"2012-01-23T13:07:05","date_gmt":"2012-01-23T12:07:05","guid":{"rendered":"http:\/\/meonline.hu\/?p=4543"},"modified":"2012-06-20T11:10:04","modified_gmt":"2012-06-20T09:10:04","slug":"kozossegi-szinter","status":"publish","type":"post","link":"https:\/\/meonline.hu\/en\/archivum\/20116\/kozossegi-szinter\/","title":{"rendered":"A Communal Stage Space"},"content":{"rendered":"<p><\/p>\n<p><strong>The reconstruction of the main square in Sz\u00e1zhalombatta<\/strong><\/p>\n<p>Archietcts: Andr\u00e1s Kor\u00e9nyi, Istv\u00e1n Zoltai<br \/>\nLandscape: G\u00e1bor Kar\u00e1di<br \/>\nText: Zsolt Szendrei<br \/>\nPhotos: Tam\u00e1s Bujnovszky<\/p>\n<p><img loading=\"lazy\" src=\"http:\/\/meonline.hu\/wp-content\/uploads\/2012\/01\/341.jpg\" alt=\"\" title=\"Fot\u00f3: Bujnovszky Tam\u00e1s\" width=\"600\" height=\"243\" class=\"alignnone size-full wp-image-4544\" srcset=\"https:\/\/meonline.hu\/wp-content\/uploads\/2012\/01\/341.jpg 600w, https:\/\/meonline.hu\/wp-content\/uploads\/2012\/01\/341-250x101.jpg 250w, https:\/\/meonline.hu\/wp-content\/uploads\/2012\/01\/341-300x121.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>The reconstruction of St Stephen\u2019s Square in Sz\u00e1zhalombatta was awarded the high-standard prize for the reconstruction of public squares in 2011. This prize was founded by the Hungarian Urbanistics Society (MUT) and the Hungarian National Board Society of ICOMOS in 2009. The main square today is wedged between two industrial complexes in the focus of an extensive housing estate zone. The environment of St Stephen\u2019s Square was gradually constructed in several phases. In 1985 first the council house was built, followed by the library and the culture centre, whilst King St Stephen\u2019s Church designed by Imre Makovecz was completed after the change of the political system in 1996. The fourth side of the square was only realized during the reconstruction of the square in 2010 with the new building designed by Andr\u00e1s Kor\u00e9nyi and Istv\u00e1n Zoltai to house a conference centre, an auditorium as well as apartments. The remodelling was meant to create a new high-standard public area, a worthy meeting place for people living in the neighbouring housing estate.<\/p>\n<p><a href=\"https:\/\/meonline.hu\/en\/subscription\/\"><img src=\"http:\/\/meonline.hu\/wp-content\/uploads\/fulltext_en.png\" alt=\"\" \/><br \/>\n<\/a><\/p>\n<p>Gener\u00e1ltervez\u0151 \/ general design: Kor\u00e9nyi \u00e9s T\u00e1rsai Kft<br \/>\nVezet\u0151 tervez\u0151k \/ leading architects:\tKor\u00e9nyi Andr\u00e1s, Zoltai Istv\u00e1n<br \/>\n\u00c9p\u00edt\u00e9sz tervez\u0151k \/ architects: Kor\u00e9nyi Bal\u00e1zs, Nagy Csilla<br \/>\nT\u00e1j\u00e9p\u00edt\u00e9sz \/ landscape: Kar\u00e1di G\u00e1bor \u2013 T\u00e1j-Consult Bt.<br \/>\nBels\u0151\u00e9p\u00edt\u00e9szet \/ interior design: Tildi B\u00e9la \u2013 DT St\u00fadi\u00f3 Kft.<br \/>\nStatika \/ structure: Pusk\u00e1s Bal\u00e1zs \u2013 Terraplan \u201997 Kft.<br \/>\n\u00c9p\u00fcletg\u00e9p\u00e9szet \/ technical installations: Temesv\u00e1ri L\u00e1szl\u00f3, Borsos Tibor \u2013 Temesv\u00e1ri Kft.<br \/>\nElektromos tervez\u00e9s \/ electrical engineering: Kelemen Ferenc \u2013 Kelevill Bt.<br \/>\nRendezv\u00e9nyk\u00f6zpont technol\u00f3gia \/ conference technology: B\u00e1rdos Tam\u00e1s \u2013 Kelevill Bt.<br \/>\nK\u00f6zleked\u00e9s, forgalomtechnika \/ traffic: Luk\u00e1cs Mikl\u00f3s \u2013 Mikroline Kft.<br \/>\nK\u00fcls\u0151 k\u00f6zm\u0171 \/ outdoor public utilities: Kov\u00e1cs P\u00e9ter \u2013 Kop\u00e9terv Kft., V\u00e1mos Istv\u00e1n \u2013 V\u00e1mos Kft<br \/>\nKivitelez\u00e9s \/ main contractor: Kalotherm Zrt.\n<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>The reconstruction of St Stephen\u2019s Square in Sz\u00e1zhalombatta was awarded the high-standard prize for the reconstruction of public squares in 2011. This prize was founded by the Hungarian Urbanistics Society (MUT) and the Hungarian National Board Society of ICOMOS in 2009. The main square today is wedged between two industrial complexes in the focus of&#8230;<\/p>\n","protected":false},"author":1,"featured_media":4544,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0},"categories":[95],"tags":[101],"_links":{"self":[{"href":"https:\/\/meonline.hu\/en\/wp-json\/wp\/v2\/posts\/4543"}],"collection":[{"href":"https:\/\/meonline.hu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meonline.hu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meonline.hu\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/meonline.hu\/en\/wp-json\/wp\/v2\/comments?post=4543"}],"version-history":[{"count":4,"href":"https:\/\/meonline.hu\/en\/wp-json\/wp\/v2\/posts\/4543\/revisions"}],"predecessor-version":[{"id":5405,"href":"https:\/\/meonline.hu\/en\/wp-json\/wp\/v2\/posts\/4543\/revisions\/5405"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meonline.hu\/en\/wp-json\/wp\/v2\/media\/4544"}],"wp:attachment":[{"href":"https:\/\/meonline.hu\/en\/wp-json\/wp\/v2\/media?parent=4543"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meonline.hu\/en\/wp-json\/wp\/v2\/categories?post=4543"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meonline.hu\/en\/wp-json\/wp\/v2\/tags?post=4543"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}